Ditmar Child Development Center Improvements

Scope: This project consisted of the placement of a modular building at Surfside Academy to house the Child Development Center.  Scope included, electrical, plumbing, paint, ceiling tiles, fire alarm and ADA ramps. Status: Complete Funding Source: Proposition H Project Cost: $315,000 Project Type: Modernization Delivery Method: Multiple-Prime Construction Start: Fall 2021 Completion: Fall 2022

Ditmar Child Development Center Improvements Read More »

Oceanside High School Special Education Classroom Improvements

Scope: The scope of work will include upgrading the flooring, paint, ceiling tile, lights to LED, fix/or provide new plumbing and/or fixtures, paint and/or replace wall coverings, reconfigure electrical throughout classrooms, repair any HVAC item, upgrade case work and countertops and thermal insulation as needed. Status: Completed Funding Source: Proposition H Project Cost: $62,960.00 Project

Oceanside High School Special Education Classroom Improvements Read More »

Oceanside High School Gym Improvements

Scope: The scope of work will remove and replace the existing clerestory windows on the saw tooth roof and installation of two big fans inside of gym and site improvements. Status: Complete Funding Source: Proposition H Project Cost: $423,000.00 Project Type: Modernization Delivery Method: Prime Contractor Construction Start: Fall 2022 Completion: Spring 2023

Oceanside High School Gym Improvements Read More »

North Terrace School Modernization

Scope: The modernization/new build of the North Terrace School will consist of the following: • Modernization of existing permanent buildings • Replacement of modular buildings • Site improvements • Single entry onto campus Status: Design Phase  Funding Source: Measure W and Department of Defense Funds Project Estimate: $90,000,000 Project Type: Modernization and New Construction Delivery

North Terrace School Modernization Read More »

Surfside Educational Academy Campus Modernization

Scope: The modernization of Surfside Educational Academy will consist of the following: • Upgrades to existing buildings • Required ADA upgrades • Required site infrastructure upgrades • Hardscape and landscape • Replacement of modulars that have exceeded life expectancy Status: Design Phase Funding Source: Measure W Project Estimate: $27,500,000 Project Type: Modernization Delivery Method: Multiple

Surfside Educational Academy Campus Modernization Read More »

Pablo Tac Groundbreaking Ceremony

On June 6, 2022, OUSD and CCM/MAAS broke ground on the Pablo Tac Elementary School campus (formally San Luis Rey Elementary School).  The school was renamed to honor the indigenous scholar whose heritage & academic work to preserve the Luiseño language embodies the school’s values. In attendance were: Dr. Stacy Begin, OUSD Board of Education

Pablo Tac Groundbreaking Ceremony Read More »

El Camino High School Locker Room Roof & Mechanical Upgrades

Scope: Replacement of roofing that is at or past its expected lifespan and perform mechanical upgrades at the El Camino High School Locker Rooms. Status: Construction El Camino HS Funding Source: Proposition H Project Estimate: $298,175 Project Type: Renovation Delivery Method: Prime Contractor   Construction Start: FALL 2021 Targeted Completion: WINTER 2021

El Camino High School Locker Room Roof & Mechanical Upgrades Read More »

El Camino High School Truax Exterior Improvements

Scope: The scope of the project includes replacement of HVAC, and access ladders that are at or past their expected lifespan at the Truax Theater at El Camino High School.  Prior completed exterior improvements also included new paint, landscaping, and handrail repair. Status: Bidding El Camino HS Funding Source: Proposition H Project Estimate: TBD Project

El Camino High School Truax Exterior Improvements Read More »

en_USEnglish
Scroll to Top