Scope: This project consisted of the placement of a modular building at Surfside Academy to house the Child Development Center. Scope included, electrical, plumbing, paint, ceiling tiles, fire alarm and ADA ramps. Status: Complete Funding Source: Proposition H Project Cost: $315,000 Project Type: Modernization Delivery Method: Multiple-Prime Construction Start: Fall 2021 Completion: Fall 2022
OUSD and CCM/MAAS hosted a Bond Overview and Contractor Outreach Event on August 22, 2022. The presentation and sign in sheets are available below. Contractor Outreach Presentation, 8-22-2022 Sign in sheet, 8-22-22
OUSD and CCM/MAAS hosted a Bond Overview and Contractor Outreach Event on June 13, 2022. The presentation and sign in sheets are available below. Contractor Outreach Presentation, 6-13-2022 Sign in sheet, 6-13-2022
On June 6, 2022, OUSD and CCM/MAAS broke ground on the Pablo Tac Elementary School campus (formally San Luis Rey Elementary School). The school was renamed to honor the indigenous scholar whose heritage & academic work to preserve the Luiseño language embodies the school’s values. In attendance were: Dr. Stacy Begin, OUSD Board of Education …
Scope: Replacement of roofing that is at or past its expected lifespan and perform mechanical upgrades at the El Camino High School Locker Rooms. Status: Construction El Camino HS Funding Source: Proposition H Project Estimate: $298,175 Project Type: Renovation Delivery Method: Prime Contractor Construction Start: FALL 2021 Targeted Completion: WINTER 2021
Scope: Replacement of roofing that is at or past its expected lifespan at the Performing Arts Center Drama Room Status: Close-Out El Camino HS Funding Source: Proposition H Project Estimate: $88,500 Project Type: Modernization Delivery Method: Multiple Prime Contractor Construction Start: SPRING 2021 Targeted Completion: SUMMER 2021
Scope: Modernization of the drama classroom at El Camino High School to include painting, floors, ceiling and lighting. Status: Bidding Phase El Camino HS Funding Source: Proposition H Project Estimate: $58,850 Project Type: Modernization Delivery Method: Multiple Prime Contractor Construction Start: SPRING 2021 Targeted Completion: SUMMER 2021
Scope: Modernization of the Music Building at El Camino High School to include new roof, paint, flooring and new LED Energy Efficient Lighting Status: Close-Out El Camino HS Funding Source: Proposition H Project Estimate: $403,000 Project Type: Modernization Delivery Method: Multiple Prime Contractor Construction Start: FALL 2020 Targeted Completion: WINTER 2021
Scope: Modernization of the locker room at El Camino High School to include locker refurbishment, fresh paint throughout, ceilings refreshed, floors polished, new LED lighting and replacement of 4 exhaust fans Status: Complete ECHS Locker Room Funding Source: Proposition H Project Estimate: $100,000 Project Type: Modernization Delivery Method: Prime Contractor Construction Start: FALL 2020 …
Scope: Demolition of buildings K and H, abatement of building F and associated site work at Jefferson Middle School Status: Complete Jefferson MS Funding Source: Proposition H Project Estimate: $353,000 Project Type: Demolition Delivery Method: Prime Contractor Construction Start: Summer 2020 Targeted Completion: Fall 2020