ECHS - Weight Room & Restrooms
-
Actual Start: Spring 2024 Bond: Measure W
Projected Finish: Summer 2027 Budget: $6,500,000.00
This project consists of the addition of two new restroom buildings and the replacement of the existing weight room. The 8 modular classrooms adjacent the weight room will be replaced by a new two-story classroom building. The stadium entryway has been reimagined to feature enhanced site elements, as well as new play courts for basketball and pickleball.

Proyectos completados
MEASURE W

ECHS - Track & Field Replacement
Actual Start: Jul 2022 Bond: Measure W
Actual Finish: Sep 2024 Budget: $1,861,605.74
Brand new field turf replaced the existing, aging field. The track surface was grinded down to an even grade, and broadcast in the school colors and striped to standards. The long jump pit covers and pole vault footings were replaced and runways also received the refurbished surfacing.

-
ECHS - Shade Structure
Actual Start: Jul 2022 Bond: Measure W
Actual Finish: Sep 2023 Budget: $194,402.00
This project brought the addition of two new 20' x 30' fabric shade structures at field level.
PROPOSITION H

ECHS - Truax Exterior Improvements
Actual Start: Jun 2021 Bond: Proposición H
Actual Finish: May 2025 Budget: $467,112.84
The scope of work consists of the installation of the five HVAC units, replacing the structural framing and curbs around each of the HVAC units, additional roof work in various locations.

-
ECHS - Truax Lighting Controls
Actual Start: Feb 2022 Bond: Proposición H
Actual Finish: Mar 2023 Budget: $48,037.96
This project consists of the addition of two new restroom buildings and the replacement of the weight room/classroom. The project also consists of planning for the stadium entryway for possible redesign and ADA compliance.

ECHS - Locker Room Roof & Mechanical Upgrades
Actual Start: May 2021 Bond: Proposición H
Actual Finish: Jun 2022 Budget: $284,268.65
Replacement of roofing that is at or past its expected lifespan and perform mechanical upgrades at the locker rooms.

ECHS - Bleachers & Gym Roof
Actual Start: Sep 2019 Bond: Proposición H
Actual Finish: Apr 2021 Budget: $1,976,370.22
This project included the removal of existing bleachers and replacing them with a new telescopic bleacher system. Additionally, the removal and replacement of 4 HVAC units with energy efficient units, including plumbing and electrical upgrades. The 25+ year old roof membrane was also replaced.

ECHS - Varsity Field Improvements
Actual Start: Sep 2018 Bond: Proposición H
Actual Finish: Aug 2020 Budget: $1,429,861.30
Nueva Construcción del campo del equipo principal de Softball incluye, casetas de jugadores, campo, y las luces. Modernización del campo existente de Junior . Actualización del área circundante, incluyendo carrera de obstáculos, jardinería nueva, nuevas cercas, y reparar la infraestructura para llevar el sitio hasta el completo cumplimiento de la ADA.
PROPOSITION G

-
ECHS - Modernization, Phase I
Actual Start: Mar 2005 Bond: Proposition G
Actual Finish: Sep 2011 Budget: $6,584,271.00
Aging facilities built in 1971, including Business and Science classroom buildings, the administration, counseling and student services, were completely upgraded with interior and exterior facelifts. The entire campus is undergoing modernization in a phased construction process that supports the school's educational program.

ECHS - New, Science & Tech Bldg
Actual Start: Oct 2000 Bond: Proposition G
Actual Finish: Mar 2007 Budget: $12,949,044.67
The new three-story Science and Technology building houses 30 classrooms and labs, four study rooms, rooftop astronomy viewing deck and two greenhouses.