NORTH TERRACE SCHOOL

Current Projects

North Terrace - Rebuild

  • Inicio de construcción: Jun 2026 Bond: Measure W

    Projected Finish: May 2029 Budget: $90,000,000.00

    This massive project involves the complete demolition of the existing campus and reconstruction of an entirely new facility. The campus design centers around Administration building that serves as the main entry control point, creating a single point of access for campus security. The elementary school features two-story buildings with over 54,000 square feet of total learning space, while the Kindergarten, Transitional Kindergarten, and Library buildings showcase a large distinctive library that faces outward toward the central campus. A multipurpose building with a large raised stage serves as a focal point for gatherings and performances. The middle school buildings are equipped with science labs and spacious learning areas designed for older students. Outdoor amenities include expansive hard-surface play courts for basketball, wallball, and pickleball, along with multiple playground areas and a new athletic field with a running track.

Proyectos completados

Proposición H

North Terrace - Mod & New

  • Actual Start: June 2010 Bond: Proposición H

    Actual Finish: June 2012 Budget: $18,314,286.00

    Construido en 1955 y que atiende principalmente a estudiantes de Camp Pendleton, North Terrace ha sido completamente reconstruido con nuevos edificios de aulas actualizadas, servicios de apoyo estudiantil y baños estudiantiles. Varias aulas se convirtieron en aulas para estudiantes con necesidades especiales y se agregaron aulas adicionales para acomodar un programa académico ampliado que sirve desde preescolar hasta 6. ° grado. La sala de usos múltiples se renovó por completo y se agregó una nueva biblioteca / centro de medios más grande. La renovación incluyó una nueva entrada principal ubicada en la calle de Santa Rosa Drive, así como un nuevo estacionamiento y nuevas áreas de juego.
Scroll to Top