Palmquist Elementary School Campus Modernization

1 de julio de 2013

Completed July 2013 Built in the mid-1960s, Palmquist Elementary School has been entirely rebuilt. In addition to modernizing existing classrooms, food service/ multipurpose room and restrooms, four new kindergarten classrooms have been added in a new location on campus that provides a separate drop-off and playground area. The library/media center and administrative student support areas […]

Mission Elementary School Campus Modernization

1 de julio de 2013

Completed July 2013 Built in 1953, Mission Elementary School has undergone a full reconstruction during the 2012-13 school year. In addition to modernizing existing classrooms, restrooms, and the food service/multipurpose room, several classrooms and the main administrative office were demolished and replaced. The library was moved to a larger, modernized building, with the former library […]

North Terrace School Campus Modernization

1 de julio de 2012

Completed July 2012 Built in 1955 and serving mainly Camp Pendleton students, North Terrace has been entirely reconstructed with new up-to-date classroom buildings, student support services and student restrooms. Several classrooms were converted to classrooms for students with special needs and additional classrooms were added to accommodate an expanded academic program serving preschool through grade […]

Oceanside High School New Music Building

1 de abril de 2012

Completed April 2012 The existing music building, built in 1955, was replaced with a new, larger two-classroom, acoustically improved building to accommodate both the band and choir programs. The new music building also provides practice and instrument storage areas, student and staff restrooms and office space.

Libby Elementary School Campus Modernization

1 de abril de 2012

Completed April 2012 Built in the mid-1960’s, Libby Elementary School underwent a complete renovation, including fully modernized classrooms, student services and library, as well a new multipurpose room and kitchen, new additional kindergarten classrooms, a new parking lot with student drop-off area, playground improvements, and unique circular seating areas for both study and rest.

El Camino High School Stadium Plaza Improvements

1 de agosto de 2011

Completed August 2011 Additional lighting, fencing, a retaining wall and stairways were added to the stadium plaza area, putting the finishing touches on the athletic field improvement project completed in fall 2010.

Oceanside High School New Career Technology Building

1 de agosto de 2011

Completed August 2011 Two classroom buildings were added to the campus to allow for expansion of the career technology educational program. The new facilities were designed specifically for students to receive health sciences and building trades career and technical training. A new 141-space parking lot was added adjacent to the buildings to provide parking in […]

Santa Margarita School Campus Modernization

1 de junio de 2011

Completed June 2011 Built in 1959 on Camp Pendleton Marine Corps Base, Santa Margarita Elementary School has been entirely reconstructed with new up-to-date classroom buildings. Only two buildings from the original campus, the multipurpose room and library, remained on site to receive complete renovation.  In addition to its contemporary architecture, the site has been fully […]

El Camino High School Athletic Field Improvement

1 de octubre de 2010

Completed October 2010 Major upgrades to the high school’s stadium were completed during the short time span between the end of the 2009 and the beginning of the 2010 football season, including a new synthetic turf athletic field and 9-lane track, ADA-accessible seating on the home grandstand and over 1,100 additional visitor seats, a ticket booth, addition of a visitors’ concession booth and […]

Oceanside High School Athletic Field Improvement

1 de octubre de 2010

Completed October 2010 The high school’s stadium received major upgrades during the short time span between the end of the 2009 and the beginning of the 2010 football season, including a new synthetic turf athletic field and 9-lane track, the addition of over 2,500 grandstand seats on the home side with relocation of over 1,000 bleacher seats and a restroom building to […]

Scroll al inicio