El Camino High School Truax Theater

Scope:

The Truax theater project includes an interior update to the lobby and ticket area with new flooring, paint, lighting, ceiling and windows. The auditorium will have new carpet and flooring seal along with a general cleaning. The exterior of the building will receive new paint at the entrance to the theater, new handrails, minor repair of plumbing and roof drains.

Status:

Complete

Truax (Before)

Funding Source:

Proposition H

Project Estimate:

$465,000

Project Type:

Modernization

Delivery Method:

Design-Bid-Build

Project Phase/Status:

 

Construction Start:

Fall 2019

Targeted Completion:

Spring 2020

 