Oceanside HS

Oceanside High School Shade Structure

Scope: This project will consist of the construction of a new shade structure on the Oceanside High School Campus. Status: Pre-design Phase Funding Source: Measure W Project Estimate: $300,000 Project Type: New Construction Delivery Method: Multiple-Prime   Construction Start: TBD Targeted Completion: TBD

OHS Roof, HVAC, and Track & Field Replacement

Scope: This project will consist of replacement of various roof and HVAC systems, along with the replacement of the running track and football field turf on the Oceanside High School Campus. Status: Pre-planning Phase Funding Source: Measure W Project Estimate: $3,770,000 Project Type: Modernization Delivery Method: Multiple-Prime   Construction Start: TBD Targeted Completion: TBD

Oceanside High School Special Education Classroom Improvements

Scope: The scope of work will include upgrading the flooring, paint, ceiling tile, lights to LED, fix/or provide new plumbing and/or fixtures, paint and/or replace wall coverings, reconfigure electrical throughout classrooms, repair any HVAC item, upgrade case work and countertops and thermal insulation as needed. Status: Nearing Completion Funding Source: Proposition H Project Estimate: $155,000 …

Oceanside High School Special Education Classroom Improvements Read More »

Oceanside High School Gym Improvements

Scope: The scope of work will remove and replace the existing clerestory windows on the saw tooth roof and installation of two big fans inside of gym and site improvements. Status: Procurement Funding Source: Proposition H Project Estimate: $560,000 Project Type: Modernization Delivery Method: Prime Contractor Construction Start: Fall 2022 Targeted Completion: Winter 2022

Oceanside High School Roof and HVAC

Scope: This project consists of replacing the existing roof with a new membrane over the main gym and the stage areas. Replacing 2 aging HVAC units for the lobby and replacing 3 non-functioning exhaust fan units with heat capable fan units. Status: Construction Oceanside HS Gym Funding Source: Proposition H Project Estimate: $1,800,000 Project Type: …

Oceanside High School Roof and HVAC Read More »

Oceanside High School New Music Building

Completed April 2012 The existing music building, built in 1955, was replaced with a new, larger two-classroom, acoustically improved building to accommodate both the band and choir programs. The new music building also provides practice and instrument storage areas, student and staff restrooms and office space.

Oceanside High School New Career Technology Building

Completed August 2011 Two classroom buildings were added to the campus to allow for expansion of the career technology educational program. The new facilities were designed specifically for students to receive health sciences and building trades career and technical training. A new 141-space parking lot was added adjacent to the buildings to provide parking in …

Oceanside High School New Career Technology Building Read More »

Oceanside High School Athletic Field Improvement

Completed October 2010 The high school’s stadium received major upgrades during the short time span between the end of the 2009 and the beginning of the 2010 football season, including a new synthetic turf athletic field and 9-lane track, the addition of over 2,500 grandstand seats on the home side with relocation of over 1,000 bleacher seats and a restroom building to …

Oceanside High School Athletic Field Improvement Read More »

Oceanside High School Gymnasium New Construction & Modernization

Completed November 2006 One of the final projects planned for Oceanside High School, the renovation of the gymnasium, also included the conversion of the stage to PE classrooms and reconstruction of the girls’ shower/locker area into department offices. New construction included a one-story front entrance addition and demolition of the existing boys’ shower/locker area, replacing …

Oceanside High School Gymnasium New Construction & Modernization Read More »