Oceanside HS

Oceanside High School Bleacher Replacement

Scope: This project consisted of the removal of existing bleachers and replacing them with a new VersaTract telescopic bleacher system. The electrical was updated to meet the requirement of the new bleachers. Status: Complete Oceanside HS Gym Funding Source: Proposition H Project Cost: $566,000.00 Project Type: Renovation Delivery Method: Multi-Prime   Construction Start: Summer 2023 […]

Oceanside High School Bleacher Replacement Read More »

Oceanside High School Track & Field Replacement

Scope: This project consisted of the replacement of the running track and football field turf on the Oceanside High School Campus.  The project also consisted of ADA upgrades. Status: Complete OHS Field Funding Source: Measure W Project Cost: $1,673,515.00 Project Type: Modernization Delivery Method: Multiple-Prime   Construction Start: Summer 2023 Targeted Completion: Spring 2024

Oceanside High School Track & Field Replacement Read More »

Oceanside High School Special Education Classroom Improvements

Scope: The scope of work will include upgrading the flooring, paint, ceiling tile, lights to LED, fix/or provide new plumbing and/or fixtures, paint and/or replace wall coverings, reconfigure electrical throughout classrooms, repair any HVAC item, upgrade case work and countertops and thermal insulation as needed. Status: Completed Funding Source: Proposition H Project Cost: $62,960.00 Project

Oceanside High School Special Education Classroom Improvements Read More »

Oceanside High School Gym Improvements

Scope: The scope of work will remove and replace the existing clerestory windows on the saw tooth roof and installation of two big fans inside of gym and site improvements. Status: Complete Funding Source: Proposition H Project Cost: $423,000.00 Project Type: Modernization Delivery Method: Prime Contractor Construction Start: Fall 2022 Completion: Spring 2023

Oceanside High School Gym Improvements Read More »

Oceanside High School Roof and HVAC

Scope: This project consists of replacing the existing roof with a new membrane over the main gym and the stage areas. Replacing 2 aging HVAC units for the lobby and replacing 3 non-functioning exhaust fan units with heat capable fan units. Status: Construction Oceanside HS Gym Funding Source: Proposition H Project Estimate: $1,800,000 Project Type:

Oceanside High School Roof and HVAC Read More »

Oceanside High School New Career Technology Building

Completed August 2011 Two classroom buildings were added to the campus to allow for expansion of the career technology educational program. The new facilities were designed specifically for students to receive health sciences and building trades career and technical training. A new 141-space parking lot was added adjacent to the buildings to provide parking in

Oceanside High School New Career Technology Building Read More »

Scroll al inicio